Contact

Innovative concrete admixtures and construction chemicals delivering reliable performance for bridges, tunnels, airports, dams, and high-rise structures.

Contacts
Location
Plot No. D-9/4, TTC Industrial Area, MIDC Industrial Area, Sanpada, Navi Mumbai, 400 706
Mumbai-Ahmedabad-High-Speed-Rail-Corridor1

Mumbai–Ahmedabad High-Speed Rail Corridor

The Mumbai–Ahmedabad High Speed Rail Corridor (MAHSR) is India’s inaugural high-speed rail line, linking Mumbai and Ahmedabad. Construction commenced in April 2020, with the 352 km Gujarat section anticipated to be fully operational by 2027, including a 50 km stretch from Surat to Bilimora in August 2026. The entire route to Mumbai is slated for completion by the end of 2028, heralding a new era of rapid intercity transportation in the country.

Project Authority: National High Speed Rail Corporation Ltd(NHSRCL)
Project Contractor: Larsen & Toubro Ltd
CAC Product Supplied: CAC Hyperfluid HES 40 ,CAC Hyperfluid R250